Since establishment in 2005, the Enterprise has implemented different projects in the field of industrial construction, in particular:

  • Development of Stari-Bohorodchany wells No. 2,3,4,5,6,7,8 in Bohorodchany district, Ivano-Frankivsk region; construction of 24 km length flowlines (diameter: 89-108 mm); construction of gas treatment units “Stari Bohorodchany” – customer “Ukrnaftogazinvest”, LLC;
  • Execution of overhaul repair works of ДУ 1000 underground industrial piping wrapping at gas compressor station “Rohatyn” – customer “Lvivtransgaz”, Gas Transmittal Pipelines Administration;
  • Development of Zvorivska No.2 Well – customer “Karpaty-Resursy”, LLC;
  • Development of wells No. 3, 4, 5 and 6 at Chaikovychi gas field; Construction of 6.8 km length flowlines (diameter: 89-108 mm); Construction of gas treatment unit “Dubanevychi” (Customer: “Geological Bureau Lviv”, LLC)
  • Development of wells No. 1 and No. 2 of Berehivska gas field; 8.54 km length flowlines construction (diameter: 89-108 mm); Construction of gas treatment unit “Vyshnia” – customer: “Horyzonty”, LLC
  • Works related to the elimination of newly formed sinkholes along with exploration, grouting and stowing wells have been performed at Stebnyk State Mining and Chemical Enterprise “Polimineral”. Construction of 2.5 km length emergency drainage pipeline (diameter: 159 mm) – customer: Stebnyk State Mining and Chemical Enterprise “Polimineral”;
  • Development of wells No. 8, 71, 73, 74 and 75 at Lentianske gas condensate field; 6,5 km length flowlines construction (diameter: 89-108 mm);
  • Two booster compressor stations for gas volume, which is compressed – 700 000 nm3/day; Customer: “Karpatygaz”, LLC as an operator of Joint Activity between the Subsidiary “Ukrgazvydobuvannia” of the National Joint-Stock Company “Naftogaz Ukrainy”, Misen Enterprises AB and “Karpatygaz”, LLC pursuant to Joint Activity Agreement No. 3 dated June 10, 2002.;
  • Participation in construction of Sambir Solar Power Plant – customer: “Sambir Solar Power Plant”, and Bohorodchanska-1 Solar Power Plant – customer: “Bohorodchanska-1 Solar Power Plant”, LLC;
  • Nondestructive examination of equipment and well rig pipes, Xmas Tree equipment, equipment for OOK type casing string piping, methanol tanks – customers: “Drilling Company “HORYZONTY”, LLC, “Ukrnaftogazinvest”, LLC, and works performance at the other objects.
  • Construction of Rava-Ruska Heat Power Plant operating from chipped wood
  • Wind Power Plant “Staryi Sambir-1” with capacity of 13.2 MW in Staryi Sambir city of Lviv region, customer: “Eco-Optima”, LLC;